Phases of design services
Process of Ecofortify architectural design
Service Description
Phase 1- Schematics During the first phase—schematic design—an architect consults with the owner to determine project goals and requirements. Often this determines the program for the project. The program, or architectural program, is the term used to define the required functions of the project. It should include estimated square footage of each usage type and any other elements that achieve the project goals. During schematic design, an architect commonly develops study drawings, documents, or other media that illustrate the concepts of the design and include spatial relationships, scale, and form for the owner to review. Schematic design also is the research phase of the project, when zoning requirements or jurisdictional restrictions are discovered and addressed. This phase produces a final schematic design, to which the owner agrees after consultation and discussions with the architect. Costs are estimated based on overall project volume. The design then moves forward to the design development phase. Phase 2- Design Development Design development (DD) services use the initial design documents from the schematic phase and take them one step further. This phase lays out mechanical, electrical, plumbing, structural, and architectural details. Typically referred to as DD, this phase results in drawings that often specify design elements such as material types and location of windows and doors. The level of detail provided in the DD phase is determined by the owner’s request and the project requirements. The DD phase often ends with a formal presentation to, and approval by, the owner. Phase 3- Construction Documents/Bids & Permits The next phase is construction documents (CDs). Once the owner and architect are satisfied with the documents produced during DD, the architect moves forward and produces drawings with greater detail. These drawings typically include specifications for construction details and materials. Once CDs are satisfactorily produced, the architect sends them to contractors for pricing or bidding, if part of the contract. The level of detail in CDs may vary depending on the owner’s preference. If the CD set is not 100 percent complete, this is noted on the CD set when it is sent out for bid. This phase results in the contractors’ final estimates of project costs. To learn more about the most common ways owners select a contractor, see Best Practice 05.03.01, Qualifications-Based vs. Low-Bid Contractor Selection.
Upcoming Sessions
Contact Details
734-637-3283
David@ecofortifyarchitecture.com
Livonia Michigan